Diaobingshan projects around the three bases grasping graspin

Contact us
contact us

Domestic News

Diaobingshan projects around the three bases grasping graspin

This year, Diaobingshan closely around the new energy and chemical, mining machinery, oil processing to carry out investment activities in the three bases, full speed up the pace of construction of industrial clusters. At present, mining machinery and accessories and processing enterprises has reached 63, mining machinery and parts processing industry cluster in the first half production value 3,280,000,000 yuan, accounting for 60.2% of gross industrial park. Oil processing bases have signed the Liao Ning Dongze bio-energy, Union Pacific, in the petrochemical enterprises, Liaoning Wan Liao Ning Zhongxu day five major projects, oil processing base has grown to 10 companies a total investment of 2.47 billion yuan, the annual oil processing 320,000 tons. New energy and chemical base in Dalian this year introduced into the food groups invest 2 billion yuan over the construction of corn deep processing projects, a new stage.
    Leading with a base arrested
    Heavy Machinery from Henan Linzhou Iron Law Group and energy companies to invest 1.5 billion coal equipment manufacturing contract was signed. Linzhou Heavy Machinery Group is a leading coal mining equipment manufacturers, domestic A-share listed company with a strong R & D and innovation capabilities, and Chinese Academy of Sciences Institute of Automation, China University of Mining and other well-known research institutes, universities established a strategic partnership development, production equipment and technology company located in the forefront of the industry.
    Diaobingshan Merchants Secretary Xu Xipeng told reporters: "The completion of this project, marking the Diaobingshan mining machinery manufacturing industry cluster has a real leading enterprises to boost the industrial base of the product from the processing accessories to the equipment manufacturing, processing level from the low-tech and rapid transition to high-end, cluster production and R & D capability has increased substantially, business coordination and cooperation be further strengthened. "

Heavy Machinery Group, following the state forest coal equipment manufacturing projects fall to the ground, but with Diaobingshan East Coal Machinery Manufacturing Co., Ltd. of Jilin Province, Liaoning Sheng days Mining Machinery Manufacturing Co., Ltd. and Shenyang Obama Friction Material Factory, 14 companies signed a investment contracts, a total investment of 3.165 billion yuan. Through industrial investment, not only the introduction of electricity into the Xinfeng mine, in peak mechanical, thermal drying God and a number of mining machinery equipment manufacturing projects, has also built a supporting whom Kester cable, Emori cable, Shanghai Pudong Wire cable, digital studio Daheng bed together CNC machine tools, electronic smart meters on Sonneratia sharp, high-pressure hoses, belts and other mining projects, formed a relatively complete industrial chain. Mining machinery manufacturing industry in the formation of cluster core, driven by foreign and domestic manufacturers all around the chain link in Diaobingshan gather to form a vibrant mining machinery manufacturing industry cluster.
    Introduced by the large project, to cultivate the core of the industrial chain links, foster industrial clusters of the leading enterprises, and through the effect of leading companies to attract, so a large number of supporting leading enterprise companies around the gathering to promote the formation of industrial clusters.
    Existing enterprises as a basis for investment chain
    The steam zone in the south of the public oil production project site, the reporter saw the area of ??35 mu, building area of ??13,400 square meters of modern plant and the construction workers busy scene in full swing, companies have purchased some equipment and begin installation and commissioning, preparing pre-production in late July.
    Diaobingshan existing large enterprises, based on the industry chain to carry out investment, attract other companies with the upstream and downstream, extending complete industrial chain. "In Germany is the core of the base oil processing, oil processing will become the pillar industry of the future Diaobingshan." Diaobingshan said Chen Xiaofeng, director of Industrial Park Administrative Committee. January to May this year alone, companies in Germany to pay taxes 20.52 million yuan, the "effect in Germany" under the impetus of last year, renewable resources, industrial park Diaobingshan Provincial Environmental Protection Department for approval to obtain approval to become the second Liaoning Province a renewable resources, industrial park to attract oil companies have settled, has formed a lubricant oil as the core of the waste oil recycling and lube base oil, lubricating oil, oil additives, bio-diesel and related packaging production is more complete, is closely related to the industrial chain.
    Turnaround, consultation, customers pick only three surface exposed
    Due for approval of a foreign company planning and design pieces over time gone through two days, the park two staff members were transferred from their posts, departments are being asked to develop corrective measures and accountability punishment. This is the park's efforts to reinforce the soft investment environment "hard" measures.
   "To emancipate the mind, to create the administrative examination and approval 'Diaobingshan speed', all the administrative examination and approval formalities of industrial investment projects date from the fittings, to within 20 working days all gone through." Park for all to administrative examination and approval responsibilities of department requirements.
    Currently, the park introduced a foreign investment enterprise key projects, lead a county-level leadership in command, a team of service, a catch in the end, the implementation of "one stop" examination and approval service. In the "stop" under the framework of the departments involved to do pieces of the collective consultation, investment property owners invited to participate in a one-time "bundled" solutions need to be addressed in the project approval problem. Merchants and by the uniform fittings throughout to assist investment property owners, led by Hall of administrative examination and approval service to bring together all the pieces of the departments involved to do, for parallel processing conferences. Consultation will be implemented "in charge" responsibility to ensure that the problem can be "spot closed" solution. Into the consultation, all done automatically start to do pieces parts department procedures, the department began tracking service, synchronization to do pieces, within specified time, then pieces to pick from no more than 20 working days, shorter than the last time more than half.
   "Turnaround, consultation, pickup, our investment property owners need only three surface exposed, very complicated administrative examination and approval procedures can be run." Vios Li, general manager of technology companies the right to "stop" to do pieces of the program is very commendable.
    Supporting letter from the Pakistani businessmen to invest 100 million yuan building materials projects Obama settled south of the brake zone. Palestine letter about why the site selection help Diaobingshan, he said: "I have two Diaobingshan unexpected, it is both unexpected attracted us." Originally, Mayor Wang Yaohua in person to discuss cooperation , but also with the Bureau of Labor and Social Security Bureau of the Secretary and power, and labor and supply of electricity is most important to this enterprise conditions, Diaobingshan approach is really unexpected, shows great determination Diaobingshan investment, thoughtful consideration for the enterprise.